
Projects
Four projects, not a photo gallery.
Every project here has a written scope, duration and constraint. Read the engineering decision that changed its course, not just the photograph.
01Residential2023
Al Waha Residential Compound
84 homes and shared amenities, handed over in three phases with early occupancy for the first block.
Riyadh18,400 m²
02Commercial2022
Business Tower
Twelve office floors and three retail levels with a glazed facade and central HVAC.
Jeddah22,000 m²
03Industrial2024
Industrial Production Facility
Steel structures, industrial floors and utilities, with production equipment installed during construction.
Dammam9,600 m²
04Hospitality2023
Hospitality Wing
A live hospitality wing refurbished without closing, keeping adjacent halls operating.
Riyadh3,200 m²
| Project | Sector | Location | Year | Area | Duration |
|---|---|---|---|---|---|
| Al Waha Residential Compound | Residential | Riyadh | 2023 | 18,400 m² | 24 months |
| Business Tower | Commercial | Jeddah | 2022 | 22,000 m² | 30 months |
| Industrial Production Facility | Industrial | Dammam | 2024 | 9,600 m² | 14 months |
| Hospitality Wing | Hospitality | Riyadh | 2023 | 3,200 m² | 8 months |
Is your project similar to one of these?
Send the scope and location, and we will tell you honestly whether it fits us.