Hospitality

Hospitality Wing

A live hospitality wing refurbished without closing, keeping adjacent halls operating.

Client type
Hospitality group
Location
Riyadh
Year
2023
Area
3,200 m²
Duration
8 months
Role
Fit-out and management

The brief

A refresh of the entrance and halls of an operating hospitality wing: ceilings, lighting, floors and fixed furniture. The main condition was that guest reception in adjacent halls must not stop.

The constraint

Working in a building running day and night, with heavy materials and a single circulation route. Noise or dust at peak times would directly affect the guest experience.

The decision

We split work into night windows and closed shifts, sealed the wing behind acoustic temporary partitions, and ran dry works by day and wet trades and deliveries at night. Prefabricated ceiling elements were assembled off site to cut time on site.

Hospitality Wing — 1Hospitality Wing — 2
Next project

Al Waha Residential Compound

Residential · Riyadh · 2023

Open project
Request your website