Industrial

Industrial Production Facility

Steel structures, industrial floors and utilities, with production equipment installed during construction.

Client type
Industrial group
Location
Dammam
Year
2024
Area
9,600 m²
Duration
14 months
Role
General contractor

The brief

An expansion of a live facility with a new production line. The client required the existing line to keep running while new equipment was installed alongside building works.

The constraint

Working inside a live plant imposed limits on noise, dust and power, and any unplanned outage cost production. Equipment slabs also needed curing time that did not fit the overall schedule.

The decision

We isolated the expansion behind an independent temporary wall, cast equipment slabs first with an accelerated curing plan, then erected the frame around the line route. Electrical tie-ins were scheduled into short, pre-agreed shutdown windows.